COMPRESSED AIR REQUIREMENTS

In general bailing velocities of 5000 ft/ min for soft materials like overburden and soft coal and 7000ft/min for heavier materials like iron ore ,etc are considered optimum for lifting off the bottom. It is better to have bailing velocity upto 8000 ft/min for drilling materials that are wet as well as heavy.

For Calculating bailing velocity, the following simple formula can be used:


  Annular Velocity in FPM (feet per minute)
BIT DIAMETER DRILL PIPE DIA. 3,500cfm 4,000cfm 5,000cfm 6,000cfm 7,000cfm
4-3/4" 2-7/8' 273 312 390 468 546
  3-1/2" 197 225 281 337 394
  4" 125 143 178 214 250
5-1/8" 2-7/8" 344 393 491 589 687
  3-1/2" 268 306 382 459 535
  4" 196 224 280 336 392
5-7/8" 2-7/8" 501 573 716 859 1002
  3-1/2" 425 486 607 729 850
  4" 354 404 505 606 707
6-1/4" 4-1/2" 359 411 513 616 718
  5" 269 307 384 460 537
6-3/4" 4" 564 645 806 968 1129
  4-1/2" 483 552 960 829 967
  5" 393 449 561 673 758
7-7/8" 4-1/2" 797 911 1139 1367 1595
  5-1/2" 607 693 866 1040 1213
  6-1/4" 438 501 626 751 877
  6-1/2" 377 431 539 645 755
9" 6-1/2" 740 846 1057 1268 1480
  7" 611 968 873 1047 1222
  7-5/8" 436 499 624 748 873
  7-3/4" 400 457 571 685 800
9-7/8" 7" 926 1059 1233 1588 1853
  7-3/4" 715 817 1022 1226 1430
  8-5/8" 442 504 631 757 883
  9-1/4" 228 261 326 391 456
10-5/8' 7-3/4" 1009 1153 1441 1729 2017
  8-5/8" 735 840 1050 1260 1470
  9" 609 696 870 1044 1218
  9-1/4" 521 596 754 895 1024
12-1/4" 8-5/8" 1445 1651 2064 2477 2890
  9" 1390 1507 1844 2261 2637
  9-1/4" 1232 1408 1759 2111 2463
  10-3/4" 659 753 941 1129 1318
 